<img alt="" src="https://secure.smart-company-365.com/266006.png" style="display:none;">

Achieve >98% Right-First-Time Smart Meter Installs

Eliminate rework, improve compliance and reduce costs with real-time automated quality control.  

Move from post-install QA to in-field quality control ensuring every job is completed right, first time. 

 

By preventing installation errors before they occur, organizations eliminate repeat visits, reduce QA costs and accelerate job completion.

 

What's the business impact? Proven results at scale across smart meter programmes from customers:

 

Paving the Way for Autonomous Networks

>98% right-first-time installs

NetLux AI - Turn Real-World Conditions into Decisions and Action

100% installations QA checked

IQGeo Mobile - Putting Intelligence Where Work Happens

£864K–£1.63M annual savings

Pole Intelligence for Planning and Execution

ROI achieved within 6–12 months

check_circle_black_48dp 1

Accelerated billing and revenue realization

Large Scale Smart Meter Rollouts Are High Risk

Cross
Installation failure rates typically average 2.5–5%
Cross
Only ~10% of installations are manually checked
Cross
Each failed install costs ~£200 in rework and disruption
Cross
~60% of failures stem from issues on site

These inefficiencies can cost £1.2M–£2.4M per year

From Reactive QA to Proactive Quality Control

Built for Real-World Field Operations

Layer 2

Traditional Approach

Layer 2 (1)

IQGeo Approach

Icon metro-cross
Post-install QA
Icon awesome-check
Real-time validation
Icon metro-cross
Sampled checks (~10%)
Icon awesome-check
100% QA coverage
Icon metro-cross
Errors found after completion
Icon awesome-check
Errors resolved on-site
Icon metro-cross
High rework costs
Icon awesome-check
Right-first-time installs
Icon metro-cross
QA costs rise as deployment volumes grow
Icon awesome-check
QA scales efficiently alongside installation growth
Layer 2

Traditional Approach

Icon metro-cross
Post-install QA
Icon metro-cross
Sampled checks (~10%)
Icon metro-cross
Errors found after completion
Icon metro-cross
High rework costs
Icon metro-cross
QA costs rise as deployment volumes grow
Layer 2 (1)

IQGeo Approach

Icon awesome-check
Real-time validation
Icon awesome-check
100% QA coverage
Icon awesome-check
Errors resolved on-site
Icon awesome-check
Right-first-time installs
Icon awesome-check
QA scales efficiently alongside installation growth

How IQGeo Enables Utilities and Contractors To Enforce Quality During Installation

Icon awesome-arrow-alt-circle-right

AI-driven photo validation

Ensure correct installation, components and image quality in real time

Icon awesome-arrow-alt-circle-right

Instant technician feedback

Errors are flagged on-site so they can be fixed immediately

Icon awesome-arrow-alt-circle-right

Automated data capture

Extract meter readings, serial numbers and asset details

Icon awesome-arrow-alt-circle-right

100% QA coverage

Replace manual sampling with full installation validation

Icon awesome-arrow-alt-circle-right

End-to-end audit trail

Every install is documented and verified for regulatory and operational compliance

Icon awesome-arrow-alt-circle-right

Performance Monitoring

Track installation quality across contractors and technicians at scale

See How IQGeo Takes Quality Compliance in Smart Meter Installations to the Next Level

 

 

Start Delivering Right-First-Time Installations Today

IQGeo can help you reduce costs, improve compliance and scale your smart meter rollout with confidence.