<img alt="" src="https://secure.smart-company-365.com/266006.png" style="display:none;">
IQGeo_Logo_w_tag_2024_on_white

Fiber Network Design

Low-level fiber design that delivers build-ready networks, right the first time.

 

Banner-Design

Deliver Build-Ready Fiber Designs with Confidence

Optimized design enables you to translate plans into accurate, construction-ready low-level designs. By correcting and validating designs before build using real-world field and survey insight, you can reduce rework, improve right-first-time rates, and ensure clean handoff into construction workflows.

Start With a Demo

 

The Fiber Design Challenges Holding You Back

Design accuracy and right-first-time delivery

Disconnected handoffs from design to build

Limited visibility into real-world and permit constraints

The Case for Optimized Fiber Network Design

50-90% reduction in planning and design efforts

Thumbs down - old way

Old Way

Thumbs up - best practice

Best Practice

Icon metro-cross
Static LLDs disconnected from field reality
Icon awesome-check
Designs corrected and validated using field and survey insight
Icon metro-cross
Design issues discovered during construction
Icon awesome-check
Pre-build design correction before construction
Icon metro-cross
Manual handoff from design to construction
Icon awesome-check
Seamless transition from LLD to construction workflows
Icon metro-cross
Limited visibility into real-world constraints
Icon awesome-check
Designs reflect real-world and permit constraints
Icon metro-cross
High rework rates and unpredictable delivery
Icon awesome-check
Higher right-first-time build rates
Thumbs down - old way

Old Way

Icon metro-cross
Static LLDs disconnected from field reality
Icon metro-cross
Design issues discovered during construction
Icon metro-cross
Manual handoff from design to construction
Icon metro-cross
Limited visibility into real-world constraints
Icon metro-cross
High rework rates and unpredictable delivery
Thumbs up - best practice

Best Practice

Icon awesome-check
Designs corrected and validated using field and survey insight
Icon awesome-check
Pre-build design correction before construction
Icon awesome-check
Seamless transition from LLD to construction workflows
Icon awesome-check
Designs reflect real-world and permit constraints
Icon awesome-check
Higher right-first-time build rates

What Optimized Fiber Network Design Delivers

Use case- design

Construction-ready low-level design (LLD)

Create accurate designs that reflect real-world build conditions

Use case- design

Pre-build design correction

Identify and resolve design issues before construction begins

Use case- design

Field, survey, and permit constraint validation

Ensure designs align with approved work areas and site realities

Use case- design

Connected network design model

Validate routes, structures, and connectivity across the network

Use case- design

Design-to-construction handoff

Generate construction-ready outputs that flow directly into execution workflows

Use case- design

Inside and outside plant design capture

Record complete design detail to support build and operations

Plan & Design

Plan & Design

Build

Build

Operate

Operate

Ready To Take Action?

IQGeo gives design teams the tools to deliver accurate, build-ready designs that build right the first time.

Streamlining the Entire Fiber Network Lifecycle

"With IQGeo you can pinpoint exactly what is planned, what is under construction, and what is built."

Deutsche_Glasfaser_logo.svg